Nuclear Maintenance Services - Gravelines Power Plant
Pending Validationv4Created by Elena Rossi · Last updated 10 Mar 2026
Client
EDF
Location
Gravelines, France
Period
Mar 2023 – Feb 2026
Sector
NuclearActivities
Tags
Completion
85%
Key Performance Indicators
€8.1M
Contract Value
36 months
Duration
6
Reactor Units Covered
450,000
Person-Hours
0
Safety Incidents
EDF (Electricité de France) is the world's largest nuclear power operator, managing 56 reactors across France with a combined capacity of over 61 GW. The Gravelines Nuclear Power Plant, located on the coast of northern France, is the largest nuclear power station in Western Europe with six 910 MW pressurized water reactors. The plant produces approximately 8% of France's total electricity output.
Long-term nuclear maintenance contract covering planned preventive maintenance, outage coordination, and safety system testing across all six reactor units at the Gravelines power plant.
SPIE holds a multi-year framework contract for electrical and instrumentation maintenance services at the Gravelines Nuclear Power Plant, supporting all six 910 MW reactor units. Our specialized nuclear-qualified teams perform planned preventive maintenance on critical electrical systems including safety-classified circuits, emergency diesel generators, and reactor protection instrumentation. During scheduled outages, SPIE deploys up to 120 technicians to execute time-critical maintenance and testing activities within the tight outage windows, ensuring units return to service on schedule. All work is performed under rigorous nuclear safety protocols, with full ALARA radiation protection management and comprehensive regulatory documentation in accordance with ASN requirements. The contract includes continuous improvement initiatives that have delivered measurable gains in maintenance efficiency and safety performance over the contract period.
- 99.7% on-time completion rate for safety-critical maintenance activities
- 15% improvement in outage duration efficiency through optimized work scheduling
- Zero safety incidents across 450,000 person-hours of nuclear-zone work
- Full ASN regulatory compliance maintained throughout the contract period
- Nuclear-qualified electrical and instrumentation maintenance (RCC-E standards)
- Outage management and critical path scheduling for PWR reactor units
- ALARA radiation protection planning and dose management
- Nuclear safety documentation and ASN regulatory compliance
Technical Review
12 Mar 2026, 16:00
Entity Manager Approval
15 Mar 2026, 10:30
Nuclear Compliance Validation
Updated KPIs and compliance section
Jean-Pierre Martin · 15 Mar 2026
Revised technical descriptions
Claire Fontaine · 20 Feb 2026
Initial draft created
Jean-Pierre Martin · 10 Jan 2026
Elena Rossi
SPIE Italy · contributor
Jean-Pierre Martin
SPIE France · admin
Claire Fontaine
SPIE France · reviewer
Excellent reference. I have reviewed the KPIs and they are consistent with the project close-out report. Ready for the next review step.
The technical descriptions are thorough and accurate. I suggest adding a brief mention of the sustainability impact for the ESG section of future export templates.
Great work on the images. Could we add a project timeline diagram as well? That would strengthen the narrative for client presentations.