HVAC System Upgrade - La Défense Tower
Published (Restricted)v2Created by Claire Fontaine · Last updated 5 Oct 2025
Client
Unibail-Rodamco-Westfield
Location
Paris La Défense, France
Period
Jun 2024 – Jun 2025
Sector
Real EstateActivities
Tags
Completion
100%
Key Performance Indicators
€2.8M
Contract Value
12 months
Duration
42
Floors Covered
40%
Energy Reduction
Unibail-Rodamco-Westfield is a leading global developer and operator of flagship commercial destinations, with a portfolio valued at over €50 billion. The company owns and operates premium shopping centres, offices, and convention and exhibition venues across Europe and the United States. Their La Défense portfolio includes several iconic office towers housing major international corporations.
Full HVAC modernization of a 42-storey office tower in La Défense, including chiller plant replacement, air handling unit upgrades, and BMS integration for enhanced energy performance.
SPIE executed a comprehensive HVAC system upgrade for a landmark 42-storey commercial tower in the La Défense business district, one of Europe's largest purpose-built business centres. The project involved replacing the entire chiller plant with high-efficiency variable-speed units, modernizing 36 air handling units across all occupied floors, and integrating the new systems into a state-of-the-art building management system. Energy modelling and thermal simulation guided the design process, resulting in a system that significantly reduces the building's carbon footprint while maintaining premium indoor comfort levels. The work was carried out in a fully occupied building, requiring meticulous planning of night shifts and weekend interventions to minimize disruption to the 3,500 daily occupants.
- 40% reduction in HVAC energy consumption compared to the legacy system
- Seamless execution in a fully occupied 42-storey tower with no tenant complaints
- BMS integration providing real-time monitoring and automated fault detection
- Projected payback period of 4.5 years through energy cost savings
- Large-scale HVAC design and engineering for high-rise commercial buildings
- Building Management System (BMS) integration and commissioning
- Occupied-building project execution with minimal tenant disruption
- Energy performance modelling and optimization
No approval workflow active
Submit this reference to start the approval process.
Updated KPIs and compliance section
Jean-Pierre Martin · 15 Mar 2026
Revised technical descriptions
Claire Fontaine · 20 Feb 2026
Initial draft created
Jean-Pierre Martin · 10 Jan 2026
Claire Fontaine
SPIE France · reviewer
Jean-Pierre Martin
SPIE France · admin
Excellent reference. I have reviewed the KPIs and they are consistent with the project close-out report. Ready for the next review step.
The technical descriptions are thorough and accurate. I suggest adding a brief mention of the sustainability impact for the ESG section of future export templates.
Great work on the images. Could we add a project timeline diagram as well? That would strengthen the narrative for client presentations.